# NTT DATA and Dell Show Why AI Pilots Must Test Scale and Infrastructure

> A promising AI pilot can still fail under the demands of enterprise scale. Learn how production-grade testing can reveal operational and financial risks before they become costly problems.

**Source**: nttdata.com | **Published**: 2026-11-26 | **Type**: article

## Key Facts

- Pilots conceal scale risks: 100 users can become tens of thousands, while 10 TB can grow to 2 PB.
- AI sizing is highly uncertain: engineers’ GPU estimates can differ by orders of magnitude, making workload testing essential.
- Bigger models may destroy ROI: a 100B-parameter model can cost far more than a 7B model for only slight gains.
- Infrastructure can delay projects for months; 100-gig networks may need 400–800-gig capacity to prevent GPU underuse.
- NTT DATA and Dell offer an accountable end-to-end AI factory, combining validated infrastructure with integration and managed services.

## Summary

NTT DATA and Dell Technologies argue that enterprises should test AI in production-like conditions before committing to broad deployment. The distinction matters: a pilot can show that a model works in a limited setting, but it cannot establish that the system will perform reliably, securely and economically across an organization.

In interviews, Jeff Ehrenhart, NTT DATA’s vice president for North America, Hybrid Infrastructure and AI Factory Platforms, and Robert Shear, Dell Technologies’ global alliances CTO, describe production-grade testing as a way to expose technical and financial risks before they become costly operating problems. Their case reflects a shift in enterprise AI spending: boards increasingly need evidence of measurable returns, not just promising demonstrations.

Pilots often use small datasets and limited numbers of users. At scale, data movement, latency, storage and network capacity can become bottlenecks; models can drift, and failover plans may prove inadequate. Shear notes that a system tested with 100 users or 10 terabytes of data may behave very differently when expanded to tens of thousands of users or two petabytes.

That makes realistic workload testing central to investment decisions. Enterprises need to assess model quality alongside time to first token, throughput and latency, while testing with data that reflects real-world quality rather than cleaned-up samples. Model size also affects economics: a 100-billion-parameter model may deliver only a modest performance gain over a 7-billion-parameter model while costing substantially more to run.

Infrastructure sizing remains difficult, Shear says, with engineers sometimes producing estimates that differ by orders of magnitude. Systems also do not scale linearly: adding GPUs does not guarantee proportional capacity if networks or storage cannot supply data fast enough. Testing can help companies avoid both underinvestment that constrains performance and oversizing that weakens returns.

The cost calculation extends beyond hardware. Ehrenhart says some enterprise AI workloads may require 400- or 800-gig networking, even where a company has recently upgraded to 100-gig. Power, cooling and facility readiness can also delay projects by many months. Training or fine-tuning models may demand larger, more power-intensive systems, while many organizations are likely to focus mainly on inference, with limited fine-tuning.

Security and governance must be tested alongside performance. AI infrastructure faces familiar threats such as ransomware, as well as risks including prompt injection and data poisoning. Data sovereignty can determine whether workloads run in public cloud, on-premises or in a regional environment; private AI may also be chosen to increase security control or visibility.

NTT DATA and Dell Technologies position their partnership as a way to combine infrastructure with implementation and ongoing operations. Dell provides AI infrastructure validated with NVIDIA, including compute, storage, GPUs, switching and software. NTT DATA adds workload strategy, data readiness, security, integration, facilities and managed services. The model reflects a broader competitive reality: enterprises need more than equipment to deploy AI; they need accountable partners able to connect infrastructure choices to business outcomes.

For CIOs, the executives recommend a project-level scorecard covering output quality, latency, throughput, resilience, security, integration and ownership, tied to a named business outcome. Each pilot should lead to a clear decision to proceed, change course or stop. That discipline also preserves flexibility as models and infrastructure evolve.

The next competitive advantage may come less from choosing the largest model than from building a repeatable process for deciding which workloads merit scale. Companies that test costs, controls and performance against real operating conditions can redirect capital sooner when a use case fails—and move faster when the evidence supports expansion.

## Entities

- **Companies**: NTT DATA, Dell Technologies, Oracle, SAP
- **Products**: NTT DATA AI Factory Munich, NVIDIA GPUs, NVIDIA software, NVIDIA switching
- **Technologies**: artificial intelligence (AI), AI factories, GPUs, agentic workflows, private AI, public cloud, on-premises infrastructure, colocation, liquid cooling, inferencing, fine-tuning, prompt injection
- **People**: Robert Shear, Jeff Ehrenhart
- **Organizations**: NVIDIA

## Key Concepts

Production-grade testing establishes whether AI pilots can scale reliably and be supported in production., Testing should use realistic workloads and data to expose performance, integration, and infrastructure bottlenecks., AI investment decisions should be tied to measurable business outcomes, projected returns, and a project-specific scorecard., Enterprises need to validate model performance, sizing, throughput, latency, resilience, and operational ownership., Security and governance testing should address data sovereignty, ransomware, prompt injection, and data poisoning., Infrastructure capacity, including networking, storage, power, and cooling, materially affects AI cost and readiness., Scaling decisions should include a clear go, change, or stop choice and account for uncertainty and future flexibility., NTT DATA and Dell Technologies combine AI infrastructure with strategy, integration, security, deployment, and managed services.

## Definitions

- **Production-grade testing**: Testing AI in conditions that closely resemble real production workloads, infrastructure, data, and operating requirements. It helps establish whether a system can scale, remain secure, and be supported.
- **AI factory**: An integrated environment of compute, storage, networking, software, and operational services designed to develop or run AI workloads.
- **Data sovereignty**: Control over where data is stored and processed, including the jurisdiction and environment in which it resides.
- **Time to first token**: The time between submitting a request to an AI model and receiving its first generated token.
- **Model drift**: A change over time in a model’s behavior or performance, often as real-world data or conditions differ from those used during development.

## Use Cases

- Testing whether an AI pilot can support a company-wide rollout with many more users and larger data volumes.
- Comparing model sizes and performance to balance output quality against operating costs.
- Measuring employee productivity, customer experience, business growth, or faster product development as AI investment returns.
- Validating AI security, data sovereignty, and governance requirements before production deployment.
- Assessing whether network, storage, GPU, power, and cooling capacity can support enterprise AI workloads.
- Using an AI factory testing ground to build and validate a proof of concept before scaling.

## Frequently Asked Questions

**Why isn’t a successful AI pilot enough to justify scaling?**

A pilot shows that an idea can work in a limited setting, but it does not prove repeatability, supportability, or performance at enterprise scale. Production testing can reveal bottlenecks, integration issues, drift, and failover gaps.

**What evidence should a business require before investing more in AI?**

Businesses should require a measurable business case, including expected returns and a way to track outcomes such as productivity or customer experience. They should also verify performance, security, legal compliance, and the ability to operate and maintain the system.

**What should enterprises include in AI testing?**

Testing should cover realistic workloads and data, model choice, sizing, output quality, time to first token, throughput, and latency. It should also assess integration, ownership, resilience, security, data movement, storage, networking, drift, and failover.

**How do infrastructure constraints affect AI projects?**

Insufficient networking or storage can leave GPUs underutilized, while power and cooling limitations can delay deployment. Training or fine-tuning models may require larger, more expensive systems than inference-focused workloads.

**What should a CIO insist on before approving a pilot for scale?**

A CIO should require a project-specific scorecard tied to a business outcome and a named owner, covering quality, latency, throughput, resilience, security, and integration. The decision should be explicitly to go, change, or stop, based on evidence, costs, and readiness to operate.

## Links

- [Read on Welcome.AI](https://welcome.ai/content/ntt-data-and-dell-show-why-ai-pilots-must-test-scale-and-infrastructure)
- [Original source](https://www.nttdata.com/en-us/insights/blog/turn-ambition-into-evidence-how-to-prove-ai-before-you-scale)

---

Source: Welcome.AI | https://welcome.ai/content/ntt-data-and-dell-show-why-ai-pilots-must-test-scale-and-infrastructure